weberdry prime G

Saint-Gobain Weber

weberdry prime G

SKU: WEBER-WEBERDRYPRIMEG-453

About this itemCIVIL SPEC APPROVED

  • Density: Approximately 1kg/lit, ensuring consistent application. IMPROVES ADHESION
  • Color: Milky white for easy visibility during application. FOR GYPSUM & CEMENT BOARDS
  • Drying Time: Dries in 0.5 to 2 hours depending on climatic conditions and application rate. QUICK DRYING
  • Service Temperature: Operates effectively between 0°C and +70°C. NON-FLAMMABLE

Instant Technical & Sales Hotline24/7 AVAILABLE

Contact for PriceEXCL. VAT
Qty:
1
In Stock · Express Delivery
Secure Payments7-Day Returns
Product WarrantyVAT-invoice

Uses & Advantages

Primary Uses

  • Primer for gypsum boards
  • Primer for cement boards
  • Enhances adhesion for waterproofing
  • Prepares substrates for 2K cementitious waterproofing
  • Used in residential and commercial projects
  • Applicable in various climates

Key Advantages

  • Improves adhesion of waterproofing layers
  • Quick drying time (0.5 to 2 hours)
  • Non-flammable and safe to use
  • Easy application with brush, roller, or broom
  • Suitable for gypsum and cement boards
  • Effective in diverse climatic conditions

FEATURES & BENEFITS

TECHNICAL DATASHEET SPEC

Density

Approximately 1kg/lit, ensuring consistent application.

Color

Milky white for easy visibility during application.

Drying Time

Dries in 0.5 to 2 hours depending on climatic conditions and application rate.

Service Temperature

Operates effectively between 0°C and +70°C.

Non-Flammable

Safe for use in various environments.

Water-Based

Allows easy cleaning of tools with water when wet.

Key Specifications

Origin: UAE
ColorMilky white
DensityApprox 1kg/lit
Drying Time0.5 to 2 hours
Service Temperature0 to +70°C
Packaging / Pack SizeAvailable in 5liter and 20liter containers.
Coverage / Yield100 to 200ml/m²
Certified standard values under UAE climate conditions.

DOWNLOADS & DATA SHEETS

Storage & Handling Guidelines

  • Store in original packaging.
  • Keep in a covered area away from direct sunlight.
  • Use within 6 months of manufacturing date.
Product packaging

RATINGS & REVIEWS

Be the first to review this product

Share your project experience, workability, and technical results with other engineers and contractors in the UAE.