
Mapei
MAPEWRAP 11
About this itemMAPEI CERTIFIED
- Workability Time: MapeWrap 11: 60 minutes at +10°C, 35 minutes at +23°C, 25 minutes at +30°C. MapeWrap 12: 150 minutes at +10°C, 50 minutes at +23°C, 35 minutes at +30°C. THIXOTROPIC EPOXY PUTTIES
- Setting Time: MapeWrap 11: 7-8 hours at +10°C, 3-3.5 hours at +23°C, 1.5-2 hours at +30°C. MapeWrap 12: 14-16 hours at +10°C, 4-5 hours at +23°C, 2.5-3 hours at +30°C. EN 1504-4 COMPLIANT
- Application Temperature Range: MapeWrap 11: +5°C to +30°C. MapeWrap 12: +10°C to +30°C. HIGH MECHANICAL STRENGTH
- Compressive Strength: Both MapeWrap 11 and MapeWrap 12 exceed 70 N/mm², meeting EN 12190 requirements. MAPEI CERTIFIED
Instant Technical & Sales Hotline24/7 AVAILABLE
Uses & Advantages
Primary Uses
- Levelling concrete, reinforced concrete, or masonry surfaces
- Structural bonding applications
Key Advantages
- Thixotropic consistency for easy application on vertical and horizontal surfaces
- High mechanical strength and no shrinkage after hardening
- Compliant with EN 1504-4 standards for structural bonding
- Suitable for a wide range of substrates, including concrete, stone, brick, and metal
FEATURES & BENEFITS
Workability Time
MapeWrap 11: 60 minutes at +10°C, 35 minutes at +23°C, 25 minutes at +30°C. MapeWrap 12: 150 minutes at +10°C, 50 minutes at +23°C, 35 minutes at +30°C.
Setting Time
MapeWrap 11: 7-8 hours at +10°C, 3-3.5 hours at +23°C, 1.5-2 hours at +30°C. MapeWrap 12: 14-16 hours at +10°C, 4-5 hours at +23°C, 2.5-3 hours at +30°C.
Application Temperature Range
MapeWrap 11: +5°C to +30°C. MapeWrap 12: +10°C to +30°C.
Compressive Strength
Both MapeWrap 11 and MapeWrap 12 exceed 70 N/mm², meeting EN 12190 requirements.
Bond Strength
Concrete-steel bond strength exceeds 3 N/mm², with failure occurring in the concrete substrate.
Durability
Resistant to freeze/thaw and hot, damp cycles, meeting EN 13733 specifications.
Key Specifications
DOWNLOADS & DATA SHEETS
Key Performance Benefits
Workability Time
MapeWrap 11: 60 minutes at +10°C, 35 minutes at +23°C, 25 minutes at +30°C. MapeWrap 12: 150 minutes at +10°C, 50 minutes at +23°C, 35 minutes at +30°C.
Setting Time
MapeWrap 11: 7-8 hours at +10°C, 3-3.5 hours at +23°C, 1.5-2 hours at +30°C. MapeWrap 12: 14-16 hours at +10°C, 4-5 hours at +23°C, 2.5-3 hours at +30°C.
Application Temperature Range
MapeWrap 11: +5°C to +30°C. MapeWrap 12: +10°C to +30°C.
Compressive Strength
Both MapeWrap 11 and MapeWrap 12 exceed 70 N/mm², meeting EN 12190 requirements.
Bond Strength
Concrete-steel bond strength exceeds 3 N/mm², with failure occurring in the concrete substrate.
Durability
Resistant to freeze/thaw and hot, damp cycles, meeting EN 13733 specifications.
Storage & Handling Guidelines
- Store in original unopened container in cool, dry indoor conditions.
- Keep away from direct sunlight, rain, and extreme heat.
- Shelf life is 12 months when stored properly between +5°C and +35°C.

Why Buy From pilehead.com?
FREQUENTLY ASKED QUESTIONS
RATINGS & REVIEWS
Be the first to review this product
Share your project experience, workability, and technical results with other engineers and contractors in the UAE.









