MAPEWRAP PRIMER 1 SP

Mapei

MAPEWRAP PRIMER 1 SP

Epoxy primer specific for the MapeWrap system
SKU: MAPEI-MAPEWRAP-PRIMER-1-SP-788

About this itemMAPEI CERTIFIED

  • Mix Ratio: 3 parts by weight of Part A to 1 part by weight of Part B SOLVENT-FREE EPOXY RESIN
  • Application Temperature: Between +10°C and +35°C LOW VISCOSITY
  • Setting Time: 3-4 hours at +23°C FOR PROFESSIONAL USE
  • Coverage: 250-300 g/m² per coat MAPEI CERTIFIED

Instant Technical & Sales Hotline24/7 AVAILABLE

Contact for PriceEXCL. VAT
Qty:
1
Available for Order
Secure Payments7-Day Returns
Product WarrantyVAT-invoice

Uses & Advantages

Primary Uses

  • Preparing concrete or reinforced concrete surfaces for MapeWrap System fabrics
  • Priming and consolidating substrates for structural reinforcement applications

Key Advantages

  • Solvent-free formulation for safer application
  • Low viscosity for easy application, including on vertical surfaces
  • Strong adhesion to concrete and metal substrates
  • Workable for up to 90 minutes at +23°C

FEATURES & BENEFITS

TECHNICAL DATASHEET SPEC

Mix Ratio

3 parts by weight of Part A to 1 part by weight of Part B

Application Temperature

Between +10°C and +35°C

Setting Time

3-4 hours at +23°C

Coverage

250-300 g/m² per coat

Complete Curing Time

28 days

Adhesion to Concrete

> 3 MPa after 7 days at +23°C (concrete breaking point)

MapeWrap Primer 1 SP is a two-component, solvent-free epoxy primer specifically designed for preparing concrete or reinforced concrete surfaces for the application of MapeWrap System fabrics. Developed in MAPEI's research laboratories, this product offers excellent adhesion, ease of application, and suitability for both horizontal and vertical surfaces. It is ideal for consolidating and priming substrates to ensure a strong bond with MapeWrap fabrics.

Key Specifications

Origin: UAE
Consistency (Part ALiquid
Consistency (Part BLiquid
ColourTransparent yellow
Specific Gravity (Mix1.1 g/cm³
Brookfield Viscosity (Mix1,200 cPs
Storage Temperature+10°C to +30°C
Packaging / Pack Size2 kg units (Part A = 1.5 kg, Part B = 0.5 kg
Certified standard values under UAE climate conditions.

DOWNLOADS & DATA SHEETS

Key Performance Benefits

  • Mix Ratio

    3 parts by weight of Part A to 1 part by weight of Part B

  • Application Temperature

    Between +10°C and +35°C

  • Setting Time

    3-4 hours at +23°C

  • Coverage

    250-300 g/m² per coat

  • Complete Curing Time

    28 days

  • Adhesion to Concrete

    > 3 MPa after 7 days at +23°C (concrete breaking point)

Storage & Handling Guidelines

  • Store in original unopened container in cool, dry indoor conditions.
  • Keep away from direct sunlight, rain, and extreme heat.
  • Shelf life is 12 months when stored properly between +5°C and +35°C.
Product packaging

Why Buy From pilehead.com?

Genuine Mapei Product
Competitive UAE Pricing
Bulk Order Support
Fast Jobsite Delivery

FREQUENTLY ASKED QUESTIONS

Q&A TECHNICAL HUB
The coverage rate is approximately 250-300 g/m² per coat.

RATINGS & REVIEWS

Be the first to review this product

Share your project experience, workability, and technical results with other engineers and contractors in the UAE.